Factory Proof Wall

Factory Proof, So You Can See We’re Actually Working

Recent updates from sampling, QC, and shipment work. If you want to see how orders usually move in practice, start here.

Last updated: Jun 12, 2026

Production Floor

From fabric spreading to stitching — this is what active orders look like on the floor right now.

Cutting Room

Fabric spreading and cutting after marker approval

Flatlock Stitching

4-needle 6-thread for flat, comfortable seams

Cover Stitch Hemming

Cover stitch binding for clean, secure edges

Sampling This Week

  • Jun 12: The sample team went back over the priority styles this morning and moved the urgent ones forward first.
  • Jun 11: QC points were checked again before packing. It takes a bit more time, but it saves trouble later.
  • If a fabric, fit, or trim detail looks shaky, it should be called out early. Waiting usually just means redoing the sample later.

What We Check Before Shipment

  • Jun 10: Fabric and trims were checked against active orders today. Better to catch a mismatch here than after cutting starts.
  • Before handover, the usual checks still matter: measurement, stitching, shade consistency, logo position, and packing details. That part is never glamorous, but it is where problems get caught.
  • If needed, QC photos or a short video can be shared before final balance so buyers can see the goods instead of guessing from a message.

Recent Order Movement

  • Jun 09: Current orders were checked against shipping windows again so the handover date does not quietly slide.
  • Packing list, carton marks, and shipment timing should match the order plan. When those details get left to the last minute, things usually go sideways.
  • If delivery timing shifts, buyers should hear it early, not after shipping has already gone tight.
Sample lead time

Usually 7–10 days once specs and fabric direction are clear.

Bulk lead time

Usually 25–35 days after sample approval and deposit.

MOQ

Usually from 100 pcs/style/color for a workable first run.

Last sync

Shared with homepage live status on Jun 12, 2026.

Recent Timeline

Jun 12

The sample team went back over the priority styles this morning and moved the urgent ones forward first.

Jun 11

QC points were checked again before packing. It takes a bit more time, but it saves trouble later.

Jun 10

Fabric and trims were checked against active orders today. Better to catch a mismatch here than after cutting starts.

Jun 09

Current orders were checked against shipping windows again so the handover date does not quietly slide.

Common Questions

How often do you share progress like this?

It depends on the order stage. Sampling, QC, and shipment usually have the clearest checkpoints, so those are the updates buyers ask for most often.

Does every order follow the exact same path?

No. Fabric choice, trims, fit problems, and shipping plans can all change the details. But the key checkpoints should still be clear before bulk moves forward.

Can buyers ask for QC photos or video?

Yes. We can share QC photos or video before shipment so you can check measurement, stitching, shade, and packing status more clearly.

Want Your Project on This Timeline Next?

Send your tech pack, reference sample, or even rough reference photos. We’ll tell you what looks workable, what looks shaky, and what should be fixed before sampling starts.